Demolition of existing retail unit retaining all existing piled foundations and ground floor slabs for reuse.
Construction of new larger 50,000 sqft steel framed retail unit.
Design of new piled foundations to accommodate extended steel frame. New fibre reinforced suspended ground floor slab on mushroom head piles.
Piling co-ordinated to avoid existing 900mm storm water sewer running beneath proposed extension.
Extensive alterations to existing drainage network and services to accommodate foundations and enlarged retail unit.
Close liaison with Local Authority and checking Engineer acting on behalf of insurance company regarding reuse of existing elements and the design of the suspended ground floor fibre reinforced slab.
All works undertaken including mezzanine and fit out works in a 24 week period.