Demolition of existing 3 story pre-cast concrete portal frame industrial building and adjacent reinforced concrete factory building, immediately adjacent to railway line.
Design of dead shore and anti sway bracing to stabilise pre-cast frame at all stages of dismantling and demolition.
Production of drawings, details, calculations, specifications for approval by Network Rail for all stages of demolition.
Detailed method statements and sequencing for erection of temporary works, dismantling and demolition works.
Design of protection scaffold on railway boundary in accordance with Network Rail specifications for both erection and dismantling.
Regular monitoring of the works, joint visits with Network Rail