  • Construction of new steel portal framed retail unit and extension of an existing steel framed retail unit to increase floor area. New portal framed retail unit attached to the side of the existing extended unit.
  • Mass concrete padcrete pad and strip foundations with a ground bearing slab. Alterations to existing drainage network designed to satisfy the water authority that no increase in flow in the network would be achieved.
  • Alterations to existing car park layout.
  • All works undertaken whilst adjacent retail units remained fully functional.