Back to project list

  • Construction of new two storey steel framed printing works sandwiched between adjacent units.
  • Building designed to accommodate a future additional storey.
  • Design of piled foundations and in situ reinforced concrete ground floor slab supported on internal piled reinforced concrete strips cast integrally with the ground floor.
  • New composite metal deck, lightweight concrete upper floor designed to accommodate heavy printing plant.
  • Design of alterations to existing drainage network.
  • Client website: www.ptal.co.uk