New 50 bed 2 story extension to hotel over new 10000 sqft conference room, new hotel reception and golf club, all cut into existing hillside.
Design of new retaining walls, terracing and banking around perimeter of site.
Main structure in steel frame incorporating 18 metre span storey height Vierendeel trusses to carry bedroom extension over clear span conference room below.
Bedroom units pre-fabricated at factory and erected on site by crane, onto main steel frame over conference room and golf club areas.
New bridge link structure to connect to existing hotel.
Extensive alterations to existing hotel structure.
Design of stormwater drainage network discharging to existing water courses. Design of foul water storage facilities to carry additional flows through existing pumped foul rising main installation.
External works design including new access roads and car parking.
Client website: www.marstonhotels.co.uk
|
|
|
|
|