Back to project list

  • Demolition of high rise blocks by cutting up and removal by tower crane, removal of ground floor slabs to facilitate new hospital development.
  • Back analysis of existing high rise structures and ground level podium slabs over basement car parks, to support heavy demolition plant without back propping.
  • Demolition sequencing, detailed method statement preparation.
  • Tower crane foundation design, propping to existing basement walls to allow removal of podium slabs, regular inspection of installations, monitoring of shoring.
  • Access scaffold design and inspection.