Demolition of high rise blocks by cutting up and removal by tower crane, removal of ground floor slabs to facilitate new hospital development.
Back analysis of existing high rise structures and ground level podium slabs over basement car parks, to support heavy demolition plant without back propping.
Demolition sequencing, detailed method statement preparation.
Tower crane foundation design, propping to existing basement walls to allow removal of podium slabs, regular inspection of installations, monitoring of shoring.
Access scaffold design and inspection.
|
|
|
|
|