Back to project list

  • Development of 39 flats immediately adjacent to Kew Bridge Railway Station.
  • Built off RC Podium slab with car parking at ground beneath.
  • Foundations bridge over a tidal trunk stormwater sewer.
  • In situ RC Frame construction to five storey block of flats to comply with disproportionate collapse regulations, other blocks in loadbearing masonry off podium slab.
  • Retaining walls to access road, P6 parapet and RC walls to access road to meet Network Rail anti collision requirements.
  • Close liaison with Network Rail and Thames Water to obtain approval for the design and construction method for the development.
  • Client website: www.barratthomes.co.uk